Skip to content
Request a Quote 0758 381708
Stacked BOKSWA maxpan hollow-pot units for suspended floor slabs

Product

Maxpans

Panels that simplify slab and ceiling construction

Overview

Precast panels that take formwork, propping and pouring time out of a suspended floor — and get you to a working surface above sooner.

A conventional in-situ slab needs shuttering built, propped, poured, cured and then stripped, and every one of those stages is labour and waiting. Maxpans replace most of that. The panels span between supporting beams and become the permanent soffit, so you are laying units instead of building and dismantling formwork.

The knock-on effects are what actually save money: less timber consumed and re-consumed, fewer props tying up the floor below, and a soffit that is already flat and ready to finish. On a multi-storey residential job, that compounds floor by floor.

Technical

  • ApplicationSuspended floor slabs, ceilings
  • FormPrecast concrete panel
  • BenefitReduced formwork and propping
  • Nominal dimensionsTo confirm
  • Span capabilityTo confirm
  • Unit weightTo confirm

Figures marked to confirm are given by our yard on request, against the production run your order is drawn from. Call 0758 381708 for current specifications.

Where it is used

Applications

Floor slabs

Suspended floors in residential and commercial builds.

Ceiling frameworks

A flat, ready soffit for finishing below.

Programme saving

Less formwork cycling means faster floor-to-floor.

Timber saving

Far less shuttering consumed across a project.

Common questions

Maxpans — asked and answered

Span depends on the panel and the supporting structure, and it is not something to guess at from a website. Send us your beam spacing and loading and we will confirm what is appropriate before you order.
No. They change how the slab is formed, not the engineering behind it. Build to your engineer's design — we supply the panels to suit it.
It varies with the job, but the saving comes from not building, propping, stripping and re-building formwork on every floor. On repetitive multi-storey work the gain is significant.

More from the range

Other lines

BOKSWA hollow concrete blocks laid out across the production yard with a finished unit in the foreground

Hollow Blocks

High-load bearing blocks for resilient walling and partitions

View product →
BOKSWA solid concrete block resting on crushed aggregate

Solid Blocks

Maximum density where the load demands it

View product →
Thousands of BOKSWA concrete pavers laid out to cure across the production yard

Pavers

Interlocking surfaces in multiple profiles

View product →
Crushed stone aggregate texture for high-strength concrete manufacturing

Tell us what you
are building.

Send the product, the quantity and where it is going. You will get a price and a delivery answer — not a brochure.